Oct 23, 2025, Posted by: Damon Blackwood
New Build Cost Estimator
Estimate Your Build Costs
Enter your total build budget to see how it breaks down by component. Based on 2024 UK data from the Construction Industry Training Board.
Cost Breakdown
Based on your input and 2024 UK industry averages
The structural frame typically accounts for 28% of total build costs, making it the largest single expense. It includes walls, floor joists, and roof trusses.
Managing the new build cost starts with knowing the biggest expense. When you embark on a brand‑new home, the price tag can feel like a mystery. Is it the foundation, the roof, or something hidden behind the walls? This guide breaks down every major cost driver, shows you which part typically burns the deepest hole in your budget, and gives practical tips to keep that number in check.
Typical cost breakdown for a new build
Industry surveys from the Construction Industry Training Board (CITB) and recent UK Housing Survey data (2024) show an average split of total spend across the major building elements. Roughly:
- Foundation and sub‑structure - 15‑20 %
- Structural frame (walls, floor joists, roof trusses) - 25‑30 %
- Roof covering and insulation - 10‑12 %
- Windows and external doors - 7‑9 %
- Plumbing and drainage - 6‑8 %
- Electrical installation - 5‑7 %
- Interior finishes (dry‑lining, flooring, kitchens, bathrooms) - 20‑25 %
Those percentages are averages; every project deviates based on design ambitions, site conditions, and material choices. To see why one line item can outpace the rest, let’s dig into each component.
Foundation - the underground investment
Foundation is the load‑bearing base of a new build, typically consisting of concrete footings, slab or piled supports. The cost is driven by soil type, groundwater level, and required depth. On a chalky site in Kent, a simple slab might be £70 per m², whereas a heavily fretted clay site in Manchester could push the price to £120 per m² due to extra excavation and de‑watering.
Because the foundation must be safe and durable, cutting corners here is rarely an option. However, selecting a slab‑on‑ground design over a full basement can shave 2‑3 % off the total budget, especially in low‑rise projects.
Structural frame - the skeleton that holds everything up
Structural Frame is the combination of load‑bearing walls, floor joists, and roof trusses that create the shape of the house. In modern UK builds, we usually see cavity wall brickwork for external walls and timber for internal floors and roof.
Materials dominate the price: a standard 215 mm cavity wall costs about £65 per m², while an insulated block wall pushes the figure to £85 per m². Timber floor joists run roughly £15 per m², but engineered timber or steel alternatives can jump to £30 per m².
Because the frame makes up a quarter of the total spend, choosing prefabricated wall panels or SIP (Structural Insulated Panels) can reduce on‑site labour and bring the cost down by up to 5 %-but only if the design accommodates them.
Roof - protecting the house from the elements
Roof is the external covering that shields a building, usually comprising decking, insulation, and weather‑proof cladding. The biggest cost drivers are the roof pitch, the choice of covering (tiles, slate, metal), and the level of insulation.
A standard felt‑underlaid tiled roof averages £45 per m², while a premium slate roof can exceed £100 per m². Adding high‑performance insulation (e.g., PIR boards) adds another £10‑15 per m² but can qualify for government Green Homes Grant, offsetting the expense.
Because roofing is exposed to weather, it’s a frequent source of callbacks, so investing in quality early can save future repair costs.
Windows and external doors - the skin of the building
Windows and Doors are the glazed and sealed openings that provide light, ventilation and security, typically fitted with u‑value‑rated units. Double‑glazed units start at £150 per m², while triple‑glazed, low‑e units can reach £300 per m².
Premium timber frames with bespoke detailing might cost 30‑40 % more than standard uPVC units. The number and size of openings also impact structural framing, so an oversized bay window can inadvertently raise the structural frame cost.
Choosing standard sizes and reputable manufacturers usually gives the best balance of performance and price.
Plumbing system - water in and waste out
Plumbing System is the network of supply lines, waste pipes, and fittings that deliver water and remove sewage from a home. Costs include pipework, fixtures (tapware, showers), and labour for installing wet rooms.
A typical three‑bedroom house with a basic bathroom suite and kitchen sink runs around £12,000‑£15,000. Upgrading to premium fixtures or adding a separate utility room can push the total beyond £20,000.
Because plumbing must comply with the Building Regulations Part G, any changes after the fact become expensive, making early specification vital.
Electrical system - power, lighting, and safety
Electrical System is the cabling, circuit breakers, sockets, and lighting fixtures that bring power safely into the dwelling. A standard installation for a 120 m² house costs about £6,000‑£8,000.
Smart home integrations, multiple lighting zones, or heavy‑duty circuits for home gyms add £2,000‑£4,000. While not the biggest line item, poor planning can inflate the budget when you have to run extra conduit later.
Interior finishes - the final touch that defines style
Interior Finishes are the collection of interior surfaces, flooring, kitchen cabinets, bathrooms, and decorative details that give a house its character. This is the most variable segment because aesthetics drive price.
Standard drywall and painted finishes might cost £30 per m², while luxury plasterwork, bespoke cabinetry, and underfloor heating can easily exceed £80 per m². Kitchen and bathroom suites alone account for 10‑15 % of the total spend, with high‑end brands reaching £10,000 per bathroom.
Because interior finishes are the last major decision point before handover, they’re often where homeowners splurge-or cut corners.
Which component tops the cost chart?
Aggregating data from the 2024 Nationwide New‑Build Index, the structural frame consistently emerges as the most expensive single category, averaging about 28 % of the total build cost. In houses with complex roof geometry or premium external cladding, the roof can edge ahead, but that’s the exception rather than the rule.
In plain‑vanilla builds-two‑storey, three‑bedroom terraced houses-the hierarchy usually looks like this:
- Structural frame
- Interior finishes
- Foundation
- Roof
- Windows and doors
- Plumbing system
- Electrical system
That ranking highlights why many builders focus on optimizing the frame layout early: a small change in wall thickness or material can shift the budget by several thousand pounds.
Factors that can flip the hierarchy
While the structural frame dominates the average, several real‑world variables can make another component the costliest:
- Site conditions: Poor ground may require deep piles, turning the foundation into the biggest line item.
- Design ambition: A bespoke roof with dormers, skylights, or a thatched finish can push roofing costs above the frame.
- Material choices: Opting for premium stone cladding or triple‑glazed windows can outweigh a standard frame.
- Energy standards: Meeting Passivhaus or Net‑Zero targets often adds extra insulation and high‑performance windows, shifting the expense balance toward the envelope.
Understanding these drivers helps you anticipate where your budget might balloon.
Tips to control the biggest expense
Because the structural frame is the heavy‑hitter, focus your cost‑control efforts here:
- Standardise wall dimensions: Stick to 215 mm cavity walls instead of custom thicker walls.
- Use modular or prefabricated components: Off‑site panelisation reduces on‑site labour and waste.
- Plan for services early: Embed plumbing and electrical chases in the frame design to avoid costly re‑work.
- Choose sensible roof geometry: Simple pitched roofs with standard covering are cheaper than complex, multi‑slope roofs.
- Leverage government grants: The 2025 Green Homes Grant covers up to 30 % of insulation and low‑e glazing, effectively lowering the envelope cost.
Even if you splurge on interior finishes, keeping the frame lean ensures the overall budget stays realistic.
Quick cost‑breakdown table
| Component | Typical % of Total Cost | Key Cost Drivers |
|---|---|---|
| Structural Frame | 28 % | Wall material, floor joist type, roof trusses |
| Interior Finishes | 22 % | Flooring, kitchen & bathroom suites, plaster |
| Foundation | 18 % | Soil condition, depth, ground‑water management |
| Roof | 11 % | Pitch, covering material, insulation level |
| Windows & Doors | 8 % | Glazing type, frame material, opening size |
| Plumbing | 7 % | Fixture quality, layout complexity |
| Electrical | 6 % | Circuit count, smart‑home features |
Mini‑FAQ
What part of a new build typically costs the most?
The structural frame - walls, floor joists and roof trusses - usually represents the largest share, around 25‑30 % of the total budget.
Can the foundation ever be the biggest expense?
Yes. On sites with weak soil, high water tables or the need for deep piling, foundation work can surge to 30 % or more of the total cost.
How do I keep the structural frame cost down?
Stick to standard cavity wall thicknesses, use timber joists instead of engineered steel where possible, and consider off‑site prefabricated panels to reduce labour.
Do high‑performance windows significantly raise the budget?
Triple‑glazed, low‑e units can cost double the price of standard double‑glazed uPVC, but they also qualify for government energy‑efficiency grants that offset part of the expense.
What are the most common ways builders overspend on interiors?
Choosing custom kitchen cabinets, high‑end bathroom suites, and premium flooring without budgeting for them early leads to surprise costs. Keep a detailed finish schedule and stick to it.
By understanding where the money goes, you can make smarter choices, avoid nasty surprises, and end up with a home that fits both your vision and your wallet.
Author
Damon Blackwood
I'm a seasoned consultant in the services industry, focusing primarily on project management and operational efficiency. I have a passion for writing about construction trends, exploring innovative techniques, and the impact of technology on traditional building practices. My work involves collaborating with construction firms to optimize their operations, ensuring they meet the industry's evolving demands. Through my writing, I aim to educate and inspire professionals in the construction field, sharing valuable insights and practical advice to enhance their projects.